We are planning to sand the Greens on Monday. Hopefully the weather is favourable and we can get the Greens back to normal conditions as soon as possible.
All the Bunkers are being filled and re-shaped as required. This will be ongoing over the Winter.
A big thank you to the Thursday Group who have done a great job on the Clubhouse driveway tidy up and also the long drawn out 6th steps. There are cones there to advise members of changed conditions, these will be removed in a week or so. There are also cones on the 6th path. These are because the path has sunk which is causing the grate to become a trip hazard. This will be repaired as soon as possible.