Its been a great week for getting work done on the Course. The greens have been Needle Tine Verti-Drained and Sanded, Surrounds have been Solid Tine Verti-Drained and the Fairways have been sliced. These are all practices that support good turf health, turf recovery and improves drainage which provide better playing surfaces.
The 1st Pond has been pumped out to a lower water level. The 1st, 3rd 13th and 4th holes have drainage which feeds back to the pond. By lowering the water level, it enables these areas that can get wet to drain quicker .
We have also painted the coloured Tee distance blocks and created mounding around some of the remaining Tree stumps on the 14th. There are numerous other areas where this mounding will continue through until Spring.